OEM Projects

Project NameCountryTonnage*Plant CapacityYear 
GE 9F Gas Turbine Piping PrefabricationWorld-Wide2,932CC:390 MW/set (9FA)CC:413 MW/set (9FB)Ongoing (Since 2002) 
GE 9E Gas Turbine Piping PrefabricationWorld-Wide1,282CC:193 MW/setOngoing (Since 2002) 
GE 6F Gas Turbine Piping PrefabricationWorld-Wide320CC:118 MW/setOngoing (Since 2002) 
GE 6B Gas Turbine Piping PrefabricationWorld-Wide255CC:64 MW/setOngoing (Since 2002) 
GE 6F.01 Gas Turbine Piping PrefabricationWorld-Wide10Ongoing (Since 2002) 
GE 9FA Gas Turbine PipingAlgeria240N/A2014 
GE Mega Deal 9FA Gas Turbine PipingAlgeria9848.400 MW2014 
9FB GT Piping Modularization-WloclawekPoland460 MW2013 
9FB GT Piping Modularization-MittelsbuerenGermany50440 MW2012 
GE Steam TurbineHP Piping PrefabricationWorld-Wide320300-399 MW/setOngoing (Since 2002) 
TOTAL 6,393 mt