Project Name | Country | Tonnage | *Plant Capacity | Year | |
GE 9F Gas Turbine Piping Prefabrication | World-Wide | 2,932 | CC:390 MW/set (9FA)CC:413 MW/set (9FB) | Ongoing (Since 2002) | |
GE 9E Gas Turbine Piping Prefabrication | World-Wide | 1,282 | CC:193 MW/set | Ongoing (Since 2002) | |
GE 6F Gas Turbine Piping Prefabrication | World-Wide | 320 | CC:118 MW/set | Ongoing (Since 2002) | |
GE 6B Gas Turbine Piping Prefabrication | World-Wide | 255 | CC:64 MW/set | Ongoing (Since 2002) | |
GE 6F.01 Gas Turbine Piping Prefabrication | World-Wide | 10 | | Ongoing (Since 2002) | |
GE 9FA Gas Turbine Piping | Algeria | 240 | N/A | 2014 | |
GE Mega Deal 9FA Gas Turbine Piping | Algeria | 984 | 8.400 MW | 2014 | |
9FB GT Piping Modularization-Wloclawek | Poland | | 460 MW | 2013 | |
9FB GT Piping Modularization-Mittelsbueren | Germany | 50 | 440 MW | 2012 | |
GE Steam TurbineHP Piping Prefabrication | World-Wide | 320 | 300-399 MW/set | Ongoing (Since 2002) | |
TOTAL | | 6,393 mt | | | |
| | |